{"id":1008,"date":"2015-06-02T11:47:18","date_gmt":"2015-06-02T11:47:18","guid":{"rendered":"http:\/\/www.umweltkonzept-dr-meyer.de\/?page_id=1008"},"modified":"2016-11-01T11:47:49","modified_gmt":"2016-11-01T11:47:49","slug":"1008-2","status":"publish","type":"page","link":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/services-a-z\/1008-2\/","title":{"rendered":"Soil Management within the scope of construction projects"},"content":{"rendered":"<p>[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text]<\/p>\n<p>Construction activities often have a significant impact on soil. Cost-intensive soil damage such as irreversible compaction, nutrient loss or pH increase may be prevented if soil is suitably managed throughout the Project.<\/p>\n<blockquote><p>Soil management is an effective tool for prevention of soil damage during large-scale construction projects, landscaping, at mining sites, but also during house construction and increasingly, in the installation of underground cables used for renewable energy supply.<\/p><\/blockquote>\n<p><strong>Possible soil damage that may result from construction projects:<\/strong><\/p>\n<ul>\n<li>irreversible soil compaction due to intensive trafficking with heavy vehicles (\u21d2 waterlogging, stunted plant growth)<\/li>\n<li>Loss of soil structure (\u21d2 waterlogging, oxygen depletion for plant roots)<\/li>\n<li>Mixing of soil layers (\u21d2 loss of nutrients and humus)<\/li>\n<li>Soil damage due to stockpiling (\u21d2 loss of nutrients and humus, topsoil deterioration)<\/li>\n<li>Increase in pH due to addition of calcareous building materials (\u21d2stunted plant growth)<\/li>\n<\/ul>\n<h3>What can we provide?<\/h3>\n<p>For construction projects we initially draw up a soil management plan that is in line with the specific requirements of the particular project &#8211; the region, soil condition, depth to groundwater, climate etc. Prior to the start of the project, we \u00a0assess various soil parameters against which the quality of the employed soil management practices will later be compared. During the construction phase, the measures outlined in the concept are applied, controlled, optimized and documented. <strong>Examples of soil management during construction:<\/strong><\/p>\n<ul>\n<li>haul road planning and design<\/li>\n<li>Selection of suitable construction vehicles<\/li>\n<li>Soil protection measures during stockpiling of stripped soil<\/li>\n<li>Preliminary measurements for placement of the stripped soil according to the original soil layers<\/li>\n<li>Consideration of weather (rainfall and soil moisture contents)<\/li>\n<li>Recultivation suggestions<\/li>\n<\/ul>\n<p><strong>The aim of soil management during construction projects is to preserve soil in such a way that it may continue to be used for planting either as a green area, garden or for agriculture without follow-up costs for recultivation.<\/strong>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_column_text el_class=&#8221;pb_infobox&#8221;]Vorgaben f\u00fcr eine bodenkundliche Baubegleitung werden z. B. in der naturschutzfachlichen Genehmigung f\u00fcr ein Bauvorhaben von der zust\u00e4ndigen Bodenschutzbeh\u00f6rde formuliert.[\/vc_column_text][vc_gallery type=&#8221;image_grid&#8221; interval=&#8221;3&#8243; images=&#8221;557,556,640,559&#8243; onclick=&#8221;link_image&#8221; custom_links_target=&#8221;_self&#8221; img_size=&#8221;150&#215;150&#8243;][vc_column_text]<a href=\"http:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2014\/12\/978-3-658-13289-7_Cover_QA_Approved-001.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1442 size-large\" src=\"http:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2014\/12\/978-3-658-13289-7_Cover_QA_Approved-001-1024x736.jpg\" alt=\"\" width=\"1024\" height=\"736\" srcset=\"https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2014\/12\/978-3-658-13289-7_Cover_QA_Approved-001-1024x736.jpg 1024w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2014\/12\/978-3-658-13289-7_Cover_QA_Approved-001-300x216.jpg 300w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2014\/12\/978-3-658-13289-7_Cover_QA_Approved-001-203x146.jpg 203w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2014\/12\/978-3-658-13289-7_Cover_QA_Approved-001-50x36.jpg 50w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2014\/12\/978-3-658-13289-7_Cover_QA_Approved-001-576x414.jpg 576w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2014\/12\/978-3-658-13289-7_Cover_QA_Approved-001-104x75.jpg 104w\" sizes=\"auto, (max-width:767px) 480px, (max-width:1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>&#8220;Baubegleitender Bodenschutz auf Baustellen &#8211; Schnelleinstieg f\u00fcr Architekten und Bauingenieure&#8221; von\u00a0Dr. Ulrike Meyer und Anne Wienigk, Springer Vieweg Essentials<\/p>\n<p><a href=\"http:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2014\/12\/Essential-Springer-BBB-2016.pdf\" target=\"_blank\">PDF Essential Springer (Kurzfassung)<\/a><\/p>\n<p><a href=\"http:\/\/www.springer.com\/de\/book\/9783658132897\" target=\"_blank\">Bestellung Essential Springer Softcover\/eBook<\/a>[\/vc_column_text][vc_column_text]<a href=\"http:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Inbetriebnahmefeier-Baubrief-Prognos.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1377 size-full\" src=\"http:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Inbetriebnahmefeier-Baubrief-Prognos.jpg\" alt=\"FOTO Inbetriebnahmefeier Baubrief Prognos\" width=\"2303\" height=\"1535\" srcset=\"https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Inbetriebnahmefeier-Baubrief-Prognos.jpg 2303w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Inbetriebnahmefeier-Baubrief-Prognos-300x200.jpg 300w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Inbetriebnahmefeier-Baubrief-Prognos-1024x683.jpg 1024w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Inbetriebnahmefeier-Baubrief-Prognos-219x146.jpg 219w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Inbetriebnahmefeier-Baubrief-Prognos-50x33.jpg 50w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Inbetriebnahmefeier-Baubrief-Prognos-576x384.jpg 576w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Inbetriebnahmefeier-Baubrief-Prognos-113x75.jpg 113w\" sizes=\"auto, (max-width:767px) 480px, (max-width:2303px) 100vw, 2303px\" \/><\/a><\/p>\n<p>Planungs- und Bauteam der 110-kV-Erdkabel-Leitung Jardelund-Weesby (Mitte: Dr. Ulrike Meyer); Inbetriebnahmefeier der Schleswig-Holstein Netz AG am 01.12.2014.[\/vc_column_text][vc_column_text]<a href=\"http:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Baubrief-Prognos.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1387 size-full\" src=\"http:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Baubrief-Prognos.jpg\" alt=\"BBB auf der Baustelle Baubrief Prognos\" width=\"2480\" height=\"2407\" srcset=\"https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Baubrief-Prognos.jpg 2480w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Baubrief-Prognos-300x291.jpg 300w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Baubrief-Prognos-1024x994.jpg 1024w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Baubrief-Prognos-150x146.jpg 150w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Baubrief-Prognos-50x50.jpg 50w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Baubrief-Prognos-576x559.jpg 576w, https:\/\/www.umweltkonzept-dr-meyer.de\/wp-content\/uploads\/2015\/01\/FOTO-Baubrief-Prognos-77x75.jpg 77w\" sizes=\"auto, (max-width:767px) 480px, (max-width:2480px) 100vw, 2480px\" \/><\/a><\/p>\n<p>Zum Thema Bodenkundliche Baubegleitung; &#8220;F\u00fcr Sie auf der Baustelle. Dr. Ulrike Meyer von Umweltkonzept Dr. Meyer&#8221;. In: BauBrief III, Schleswig-Holstein Netz AG\/ Prognos AG, September 2014.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;2\/3&#8243;][vc_column_text] Construction activities often have a significant impact on soil. Cost-intensive soil damage such as irreversible compaction, nutrient loss<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":887,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1008","page","type-page","status-publish","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/wp-json\/wp\/v2\/pages\/1008\/"}],"collection":[{"href":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/wp-json\/wp\/v2\/pages\/"}],"about":[{"href":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/wp-json\/wp\/v2\/types\/page\/"}],"author":[{"embeddable":true,"href":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/wp-json\/wp\/v2\/users\/2\/"}],"replies":[{"embeddable":true,"href":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/wp-json\/wp\/v2\/comments\/?post=1008"}],"version-history":[{"count":5,"href":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/wp-json\/wp\/v2\/pages\/1008\/revisions\/"}],"predecessor-version":[{"id":1487,"href":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/wp-json\/wp\/v2\/pages\/1008\/revisions\/1487\/"}],"up":[{"embeddable":true,"href":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/wp-json\/wp\/v2\/pages\/887\/"}],"wp:attachment":[{"href":"https:\/\/www.umweltkonzept-dr-meyer.de\/en\/wp-json\/wp\/v2\/media\/?parent=1008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}